Muh-Cherng Wu

29 707c6f08
29 707c6f08

Muh-Cherng Wu Professor

  • Ph.D., Purdue University, USA
  • Computer Integrated Manufacturing, Semiconductor Manufacturing Management, Supply Chain Management, Data Mining
| Email: mcwu512 [at] gmail.com | Office:
  • Chi-Shiuan Lin, Pei-Yi Li, Jun-Min Wei, Muh-Cherng Wu*, 2020, Integration of process planning and scheduling for distributed flexible job shops, Computers & Operations Research. Volume 124, No. 105053. (SCI)
  • Muh-Cherng Wu, Pei-Chun Liu, and Hui-Chih Hung, 2019, A Case Study of Stock Investment Based on Data Mining Techniques, International Journal of Innovation in Management, Volume 7, No. 1, pp. 15-19.
  • Chi-Shiuan Lin, I-Ling Lee, Muh-Cherng Wu*,  2019, Merits of Using Chromosome Representations and Shadow Chromosomes in Genetic Algorithms for Solving Scheduling Problems, Robotics and Computer-Integrated Manufacturing. (SCI)
  • Po-Hsiang Lu, Muh-Cherng Wu*, Hao Tan, Yong-Han Peng, and Chen-Fu Chen, 2018, A genetic algorithm embedded with a concise chromosome representation for distributed and flexible job-shop scheduling problems, Journal of Intelligent Manufacturing, Volume 29, Issue 1, pp. 19-34. (SCI)
  • Muh-Cherng Wu*, Chi-Shiuan Lin, Chia-Hui Lin, and Chen-Fu Chen, 2017, Effects of Different Chromosome Representations in Developing Genetic Algorithms to Solve DFJS Scheduling Problems, Computers & Operations Research, Volume 80, pp. 101–112. (SCI)
  • Hui-Chih Hung*, Chung-Yu Chung, Muh-Cherng Wu, and Wan-Ling Shen, 2017, A membership pricing policy to facilitate service scale-expansion, The Service Industries Journal, Volume 37, No. 3-4, pp. 167-189. (SSCI)
  • Hui-Chih Hung*, Yu-Chih Chiu, Muh-Cherng Wu, 2017, Analysis of Competition Between IDM and Fabless–Foundry Business Models in the Semiconductor Industry, IEEE Transactions on Semiconductor Manufacturing, Volume 30, Issue 3, pp. 254-260. (SCI)
  • Hui-Chih Hung*, Yu-Chih Chiu, Muh-Cherng Wu, 2017, A modified Lotka–Volterra model for diffusion and substitution of multi-generation dram processing technologies, Mathematical Problems in Engineering. Volume 2017, Article ID 3038203, 12 pages. (SCI)
  • Hui-Chih Hung*, Yu-Chih Chiu, Huang-Chen Huang, Muh-Cherng Wu, 2017, An enhanced application of Lotka-Volterra model to forecast the sales of two competing retail formats, Computers & Industrial Engineering, Volume 109, pp. 325-334 (SCI)
  • Hui-Chih Hung*, Yun-San Tsai, and Muh-Cherng Wu, 2014, A modified Lotka-Volterra model for competition forecasting in Taiwan’s retail industry, Computers & Industrial Engineering, Volume 77, pp. 70-79. (SCI)
  • Chie-Wun Chiou, and Muh-Cherng Wu,2014,Scheduling of Multiple in-Line Steppers for Semiconductor Wafer Fabs,International Journal of Systems Science,Vo.45,No.3,pp384-398 (SCI)
  • Chen-Fu Chen, Muh -Cherng Wu, and Keng-Han Lin,2013,Effect of Solution Representations on Tabu Search in Scheduling Applications,Computers & Operations Research,Volume 40,issue 12,pp2817-2825 (SCI)
  • Chen-Fu Chen, Muh-Cherng Wu, Yi-Hsun Li, Pang-Hao Tai, and Chie-Wun Chiou,2013,A Comparison of Two Chromosome Representation Schemes Used in Solving a Family-Based Scheduling Problem,Robotics and Computer Integrated Manufacturing,Volume 29,issue 3,pp21-30 (SCI)
  • Chie-Wun Chiou, Wen-Min Chen, and Muh-Cherng Wu,2013,A Combined Dispatching Criteria Approach to Scheduling Dual Flow Shops,International Journal of Production Research,Vol. 51,No. 3,pp927-939 (SCI)
  • Chie-Wun Chiou, Wen-Min Chen, Chin-Min Liu, and Muh-Cherng Wu,2012,A Genetic Algorithm for Scheduling Dual Flow Shops,Expert Systems With Applications,Volume 39,issue 1,pp1306-1314 (SCI)
  • Muh-Cherng Wu, Y. K. Hsu, Liang-Chuan Huang,2011,An Integrated Approach to the Design and Operation for Spare Parts Logistic Systems,Expert Systems With Applications,Vol. 38,pp2990-2997 (SCI)
  • Muh-Cherng Wu, Liang-Chuan Huang, Hsi-Mei Hsu and Tai-Sheng Su,2011,Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand,Journal of the Operational Research Society,Vol.62,pp1075-1084 (SCI)
  • Shang Hwa Hsu, Chun-Chia Lee, Muh-Cherng Wu, Kenichi Takano,2010,The influence of organizational factors on safety in Taiwanese high-risk industries,Journal of Loss Prevention in the Process Industries,Vol. 23,No. 5,pp646-653 (SCI)
  • Muh-Cherng Wu, Chang-Fu Shih and Chen-Fu Chen,2010,An Analysis of Ceiling Height Requirement for a Large-scale Semiconductor Fab,International Journal of Production Research,Vol. 48,No. 12,pp3697-3706 (SCI)
  • Wu, Muh-Cherng and Chiou, Chie-Wun,2010,Scheduling Semiconductor In-line Steppers in New Product/Process Introduction Scenarios,International Journal of Production Research,Vol. 48,pp1835-1852 (SCI)
  • H. M. Hsu, T. S. Su, M. C. Wu, and L. C. Huang,2009,Multiple Lot-Sizing Decisions with an Interrupted Geometric Yield and Variable Production Time,Computers & Industrial Engineering,Vol. 57,pp699-706 (SCI)
  • Shang Hwa Hsu, Ming-Hui Wen, and Muh-Cherng Wu,2009,Exploring User Experiences as Predictors of MMORPG Addiction,Computers & Education,Vol. 53,No. 3,pp990-999 (SCI),(SSCI)
  • Hsi-Mei Hsu, Yai Hsiung, Ying-Zhi Chen, Muh-Cherng Wu,2009,A GA Methodology for the Scheduling of Yarn-Dyed Textile Production,Expert Systems with Applications,Vol. 36,pp12095-12103 (SCI)
  • C.W. Chiou, and Muh-Cherng Wu,2009,GA-Tabu Algorithm for Scheduling In-line Steppers in Low-Yield Scenarios,Expert Systems with Applications,Vol. 36,pp11925-11933 (SCI)
  • Muh-Cherng Wu, Chang-Fu Shih and Chen-Fu Chen,2009,An Efficient Approach to Cross-Fab Route Planning for Wafer Manufacturing,Expert Systems with Applications,Vol. 36,pp10962-10968 (SCI)
  • H. M. Hsu, T. S. Su, M. C. Wu, and L. C. Huang,2009,A Multiple Lot-Sizing Decision for Two-Stage Systems with Interrupted Geometric Yield and Non-rigid Demand,Journal of the Chinese Institute of Industrial Engineers,Vol.26,pp229-244 (EI)
  • M. C. Wu, C. F. Chen, and C. F. Shih,2009,Route Planning for Two Wafer Fabs with Capacity-Sharing Mechanisms,International Journal of Production Research,Vol 47,No 20,pp5843-5856 (SCI)
  • Shang Hwa Hsu, Ching-Han Kao, Muh-Cherng Wu,2009,Design Facial Appearance for Roles in Video Games,Expert Systems with Applications,Vol 36,No 3,pp4929-4934 (SCI)
  • M. C. Wu, S. J. Chiou, and C. F. Chen,2008,Dispatching for make-to-order wafer fabs with machine-dedication and mask set-up characteristics,International Journal of Production Research,Vol 46,pp3993-4009 (SCI)
  • M. C. Wu and W. J. Chang,2008,A Multiple Criteria Decision for Trading Capacity between Two Semiconductor Fabs,Expert Systems with Applications,Vol. 35,pp938-945 (SCI)
  • M. C. Wu and T. U. Hung,2008,A Hit-Rate Based Dispatching Rule for Semiconductor Manufacturing,International Journal of Industrial Engineering-Theory, Applications and Practice,Vol. 15,No. 1, (SCI)
  • S. H. Hsu, C. C. Lee, M. C. Wu, K. Takano,2008,A Cross-Cultural Study of Organizational Factors on Safety: Japanese vs. Taiwanese Oil Refinery Plants,Accident Analysis & Prevention,Vol. 40,No. 1,pp24-34 (SSCI)
  • M. C. Wu, J. H. Jiang and W. J. Chang,2008,Scheduling a Hybrid MTO/MTS Semiconductor Fab with Machine-Dedication Feature,International Journal of Production Economics,Vol. 112,No. 1,pp416-426 (SCI)
  • M. C. Wu and Y. K. Hsu,2008,Design of BOM Configuration for Reducing Spare Parts Logistic Costs,Expert Systems with Applications,Vol. 34,pp2417-2423 (SCI)
  • M. C. Wu, Y. F. Lo, and S. H. Hsu,2008,A Fuzzy CBR Technique for Generating Product Ideas,Expert Systems with Applications,Vol. 34,pp530-540 (SCI)
  • S. H. Hsu, M. H. Wen, and M. C. Wu,2007,Exploring Design Features for Enhancing Players’ Challenge in Strategy Games,CyberPsychology & Behavior,Vol 10,No. 3,pp393-397 (SSCI)
  • Hsu, S. H., Kao, C. H., & Wu, M. C.,2007,Factors Influencing Player Preferences for Heroic Roles in Role-Playing Games (RPG),CyberPsychology & Behavior,Vol. 10,No. 2,pp293-295 (SSCI)
  • Muh-Cherng Wu and Wen-Jen Chang,2007,A short-term capacity trading method for semiconductor fabs with partnership,Expert Systems with Applications,Vol. 33,pp476-483 (SCI)
  • M. C. Wu, S. C. Wu, T. C. Hsia, and S. H. Hsu,2006,A Similarity Inference Method for Reducing the Cost of Pair Comparison,International Journal of Advanced Manufacturing Technology,Vol. 27,pp774-780 (SCI)
  • M. C. Wu, C. S. Chien, and K. S. Lu,2006,Yield Improvement Planning for the recycle Processes of Test Wafers,International Journal of Advanced Manufacturing Technology,Vol. 27,pp1228-1234 (SCI)
  • M. C. Wu, Jian-Ren Chen, and Jung-Hong Chuang,2006,A-trimmed Skeleton for Modeling the Global Shape of Polygons,International Journal of Advanced Manufacturing Technology,Vol. 27,pp1140-1147 (SCI)
  • Yai Hsiung , Muh-Cherng Wu, and Hsi-Mei Hsu,2006,Tool Planning in Multiple Product-Mix Under Cycle Time Constraints for Wafer Foundries Using Genetic Algorithm,Journal of the Chinese Institute of Industrial Engineers,Vol. 23,No.2,pp174-183 (EI)
  • M. C. Wu, Y. L. Hung, Y. C. Chang, K. F. Yang,2006,Dispatching in Semiconductor Fabs With Machine-Dedication Features,International Journal of Advanced Manufacturing Technology,Vol. 28,pp978-984 (SCI)
  • M. C. Wu, S. H. Sun,2006,A Project Scheduling and Staff Assignment Model Considering Learning Effect,International Journal of Advanced Manufacturing Technology,Vol. 28,pp1190-1195 (SCI)
  • M. C. Wu, W. J. Chang, and C. W. Chiou,2006,Product Mix Decision in a Mixed-Yield Wafer Fabrication Scenario,International Journal of Advanced Manufacturing Technology,Vol. 29,pp746-752 (SCI)
  • Hsu, S.H., Lee, F.L., & Wu, M.C.,2006,An integrated approach to achieving optimal design of computer games,Expert Systems with Applications,Vol. 31,pp145-149 (SCI)
  • M. C. Wu, Y. F. Lo, and S. H. Hsu,2006,A Case-Based Reasoning Approach to Generating New Product Ideas,International Journal of Advanced Manufacturing Technology,vol. 30,pp166-173 (SCI)
  • Muh-Cherng Wu, Sheng-Yu Lin and Chia-Hsin Lin,2006,An Effective Application of Decision Tree to Stock Trading,Expert Systems with Applications,Vol. 31,pp270-274 (SCI)
  • M. C. Wu, Y. Hsiung, and H. M. Hsu,2005,A tool planning approach considering cycle time constraints and demand uncertainty,International Journal of Advanced Manufacturing Technology,Vol. 26,pp565-571 (SCI)
  • M. C. Wu, C. S. Chien, and K. S. Lu,2005,Downgrade decision for control/dummy wafers in a fab,International Journal of Advanced Manufacturing Technology,Vol. 26,pp585-560 (SCI)
  • M. C. Wu and K. C. Fu,2005,An Operator Staffing and Assignment Model for Foundry Fabs,International Journal of Advanced Manufacturing Technology,Vol. 26,pp1429-1435
  • M. C. Wu, Y. Hsiung, and H. M. Hsu,2005,Tool planning in the scenario of multiple existing semiconductor fabs,International Journal of Advanced Manufacturing Technology,Vol. 27,pp145-151 (SCI)
  • Hsu, S.H., Lee, F.L., & Wu, M.C,2005,Designing action games for appealing to buyers,CyberPsychology & Behavior,Vol. 8,No. 6,pp585-591 (SSCI)
  • M. C. Wu, C. W. Chiou, and H. M. Hsu,2004,Scrapping small lots in a low-yield and high-price scenario,IEEE Transactions on Semiconductor Manufacturing,Vol 17,No. 1,pp55-67 (SCI)
  • S. H. Hsu, T. C. Hsia, and M. C. Wu,2002,A Cost Effective Approach to Establish Benchmark for Automatic Workpiece Classification Systems,International Journal of Industrial Engineering-Theory, Applications and Practice,Vol. 9,No.2,pp112-122 (SCI)
  • T. C. Hsia, S. H. Hsu, W. Y. Huang, and M. C. Wu,2000,Enhancing the Effectiveness of Lean Clustering in Establishing Benchmarks for Automatic Classification System,International Journal of Manufacturing Technology and Management,Volume 1,Nos. 2/3,pp288-317 (其他)
  • H. M. Hsu, S. P. Tsai, M. C. Wu and C. K. Tzuang,1999,Optimal Design of Microwave Filter Based on Genetic Algorithm,International Journal of Industrial Engineering—Applications and Practice,6(4),pp282-288 (SCI)
  • J. H. Chuang, P. H. Wang, M. C. Wu,1999,Automatic Classification of Blocked Shaped Parts Based on Their 2D Projections,Computer and Industrial Engineering,Vol. 36,pp697-718 (SCI)
  • 陳建任、巫木誠、莊榮宏,1999,沖壓件骨架表達法及其自動分類之研究,工業工程學刊,第十六卷,第四期,pp483-494 (EI)
  • M. C. Wu,1998,Justification of Concurrent Engineering Environments Based on Fuzzy Mathematics,International Journal of Production Research,Vol. 36,No. 7,pp2025-2041 (SCI)
  • S. H. Hsu, T. C. Hsia, and M. C. Wu,1998,An Efficient Method for Creating Benchmark Classifications for Automatic Workpiece Classification Systems,International Journal of Advanced Manufacturing Technology,Vol. 14,pp481-494 (SCI)
  • M. C. Wu and S. Y. Chen,1997,A Multiple Criteria Decision Making Model for Justifying the Acceptance Rush Orders,Production Planning and Control,Vol. 8,No. 8,pp753-761 (SCI)
  • S. H. Hsu, T. C. Hsia, and M. C. Wu,1997,A Flexible Classification Method for Evaluating the Utility of Automated Workpiece Classification System,International Journal of Advanced Manufacturing Technology,Vol 13,pp637-648 (SCI)
  • M. C. Wu and J. T. Wang,1996,An Algorithm for Converting the Contour of 2D Workpiece into a Rectilinear Polygon,Computers in Industry,Vol.29,pp197-208 (SCI)
  • M. C. Wu and S. Y. Chen,1996,A Cost Model for Justifying the Acceptance of Rush Orders,International Journal of Production Research,Vol.34,No.7,pp1963-1974 (SCI)
  • M. C. Wu and S. R. Jen,1996,A Neural Network Approach to the Classification of 3D Prismatic Parts,International Journal of Advanced Manufacturing Technology,Vol.11,pp325-335 (SCI)
  • M. C. Wu and C. R. Liu,1996,Analysis on Machined Feature Recognition Based on B-REP,Computer Aided Design,Vol.28,No.8,pp603-616 (SCI)
  • M. C. Wu and M. S. Lin,1996,Automatic Construction of CSG Solids from a Single Isometric View,International Journal of Computer Integrated Manufacturing,Vol.9,No.1,pp1-21 (SCI)
  • M. C. Wu, J. R. Chen, and S. R. Jen,1994,Global Shape Information Modeling and Classification of 2D Workpieces,International Journal of Computer Integrated Manufacturing,Vol.7,No.5,pp261-275 (SCI)
  • M. C. Wu and J. R. Chen,1994,A Skeleton Approach to Modelling 2D Workpieces,Journal of Design and Manufacturing,Vol.4,pp229-243
  • 黃俊堯,巫木誠,林文燦,1994,幾何式品質機能展開,工業工程學刊,第十一卷,第一期,pp9-20 (EI)
  • M. C. Wu and J. Y. Yen,1993,A Skeleton-Retrieving Technique for Aiding Modular-Fixtures Design,International Journal of Advanced Manufacturing Technology,Vol.8,pp123-128 (SCI)
  • M. C. Wu and T. Y. Wu,1993,A Skeleton Approach for Modeling Assembly Products,Journal of Design and Manufacturing,Vol.3,pp121-133
  • 黃振榮、巫木誠、羅國銘,1993,產業政策中金融優惠措施之成效評估架構,管理科學學報,第十卷,第一期,pp47-69 (TSSCI)
  • C. Y. Tai, T. S. Chen and M. C. Wu,1992,An Enhanced Taguchi Method for Optimizing SMT Processes,Journal of Electronics Manufacturing,Vol.2,pp91-100 (SCI)
  • M. C. Wu and C. R. Liu,1991,Flexible Process Planning for Finish machining Based on Process Requirement Modeling,International Journal of Computer Integrated Manufacturing,Vol. 4,No. 2,pp121-133 (SCI)
  • M. C. Wu, C. L. Bajaj, and C. R. Liu,1988,Face Area Evaluation Algorithm for Solids,Computer Aided Design,Vol. 20,No. 2,pp75-82 (SCI)
 
  • 染色體之非完整表達法與優質候選解產生法|2018年08月 ~ 2021年07月|科技部
  • 紅利分享式商店租金合約設計|2015年08月 ~ 2016年10月|科技部
  • 高維空間搜尋問題之解表達法的研究|2015年08月 ~ 2018年07月|科技部
  • 晶圓代工廠短期產能交易定價機制|2013年08月 ~ 2015年07月|國科會
  • 以進化搜尋演算法求解流線群組排程問題|2011年08月 ~ 2014年07月|國科會
  • 新製程導入情境下連線式步進機之排程|2010年08月 ~ 2013年07月|國科會
  • 半導體產業大型廠房之設施規劃|2007年08月 ~ 2010年10月|國科會
  • 新產品/製程導入情境下TFT-LCD產業的製造管理|2007年08月 ~ 2010年10月|國科會
  • 2016|Best Practice Paper Award (1st Prize)|Asia Pacific Industrial Engineering and Management Systems Conference
  • 2014|年度年會暨學術研討會最佳論文獎(碩士生:章啟榕、黃勝賢;指導教授:巫木誠)|中國工業工程學會
  • 2013|中華民國科技管理學會院士(Fellow)|中華民國科技管理學會
  • 2013|亞太工業工程與管理學會會士(APIEMS Fellow)|亞太業工程與管理學會(Asian Pacific Industrial Engineering and Management Society)
  • 2011|供應鏈管理論文獎博士組佳作(指導博士生論文)|中華民國管理科學學會
  • 2007|國立交通大學 傑出教學獎|國立交通大學
  • 2007|工業工程論文獎|中國工業工程學會
  • 1997|教育部製造業自動化網路多媒體教材佳作獎|教育部
  • 1990|教育部特優教師獎|教育部